= 108 in. endobj
Length of run = 856 ft. (Pipe Diameter lift thickness) + (Fill above pipe lift thickness) (1 lift) = 3) (36 in. Shop drawings, 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction, SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. Try Now! Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4, VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS BY JOHN FLECKENSTEIN PIPELINE AND DRAINAGE CONSULTANTS INTRODUCTION History Of Post, 601.1 601.2(a) SECTION 600 INCIDENTAL CONSTRUCTION SECTION 601 PIPE CULVERTS 601.1 DESCRIPTION This work is construction or reconstruction, inspection, and cleaning of pipe culverts; including subsurface, Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts, STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. 200 sieve (75 micrometers). The UD 4 is used with new construction, while the UD 7 is used for retrofitting existing pavements. 200 sieve. Weigh clean dry container and record weight. Enrollment can be completed on through Germanna Community College or CCWA. Applications for a zoning district map amendment (rezoning), conditional rezoning, planned development, or conditional use permit shall include a VDOT traffic impact statement (VTIS), and applications for a site plan or preliminary plat shall include a traffic impact statement (TIS), where the proposed development is reasonably anticipated to . SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. If you wish to receive this content in an accessible format per Section 508 of the federal Rehabilitation Act, 29 U.S.C. These guidelines are applicable to the locating, marking, SECTION 5 - STORM DRAINAGE 5.01 Design Storm drainage facilities shall be designed in accordance with the goals and guidelines set forth in the Unified Development Ordinance. The most common underdrains are known as UD 4 and UD 7. If you have questions, please provide us with the course title and number when e-mailing or calling. 6) The tolerance on the optimum moisture content at which aggregate must be compacted is 2 percentage points. The side is called the drainage side. Compaction testing on No. Pipe Testing Frequency Example 1: Pipe Diameter = 48 in. VDOTSoilsandAggregateCompaction 6 FIELDMOISTUREANDDENSITYTESTING WITHTHENUCLEARGAUGE LEARNINGOUTCOMES . Provide, SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION, Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE. # u
Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL. Silt tight joints provide protection against infiltration of the backfill material containing a high percentage of fines, and typically utilize some type of filtering or sealing component, such as an elastomeric rubber seal or geotextile. We will be looking into this with the utmost urgency, The requested file was not found on our document library. 1 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL LEARNING OUTCOMES Understand basic pipe and soil concepts and how they relate to preconstruction issues Understand fundamental trench concepts and pipe installation procedures Understand . Community College Workforce Alliance | The Mission of CCWA is to meet . 57 stone can be used as a backfill in the sub foundation. A compacted soil has a reduced rate of both water infiltration and drainage. Your one-stop source for VDOT maps, data and project info. %%EOF
), Index. Get the free VDOT Soils and Aggregate Compaction Description . Drop Inlet Backfill Frequency Example: Depth of Backfill = 9 feet Depth of Backfill (ft.) x 12 inches /foot = Depth of backfill in inches 1) 9ft. Structure Earthwork: 02200. Responds to data requests. General: Submit the following in accordance with The General Conditions. Geotechnical Bulletin PLAN SUBGRADES, SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS, SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES, Specification Guidelines: Allan Block Modular Retaining Wall Systems, Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS, SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General, June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL, HDPE PRODUCTS QUALITY, PERFORMANCE AND ECONOMY COMBINED, Chapter 3 CULVERTS. Manhole Backfill Frequency Example: Depth of Backfill = 9 feet Depth of Backfill (ft.) 5 ft. = Depth of Backfill below top 5 feet 1) 9 ft. 5 ft. = 4 ft. 2) 4 ft. x 3 lifts/ft. List components of edge drain systems 3. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING. As stated earlier, soils are made up of many different types, shapes and sizes of particles. The gradation is the distribution of various particle sizes within the material. How far should the hammer fall?, What are the moisture and density content corresponding to the peak of the curve . VDOT Soils and Aggregate Compaction 2016v1.0 Appendix D | 1 Fine particles are more sensitive to the presence of water than coarse particles. All materials and workmanship, TABLE OF CONTENTS NO. Place sample in container and weigh. The exploration should extend to a depth equal to per foot of fill height or 8, whichever is greater. All rights reserved. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall, Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY Policy: This policy will replace all previous policies regarding the selection of pipe material for cross drains, drive pipe, drop pipe, storm, SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. CULVERTS AND BRIDGES 7-5 7.7. Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. 2. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily, 155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS, SECTION 9 SEWER/DRAINAGE LINES 9.1 GENERAL This section covers the requirements for piping materials and installation in the Cedar Hills City sewer and drainage collection system. 16) What is the level of compaction required for pipe backfill? This website includes hyperlinks to sites neither controlled nor sponsored by VDOT or the Commonwealth of Virginia. Length of run = 275 ft. (Pipe Diameter lift thickness) + (Fill above pipe lift thickness) (1 lift) = 1) (48 in. This section covers excavation and trenching work and shall include the necessary clearing, grubbing, and preparation, BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. qc]o^~n_Q%adt|Ha$|y%{DF0*&pu6YoV77Rjk1}O7MEnvGHN5ltvMaCpZVl^hTlkQ0Vd5Lgf]n v.l
PU5,ep
jL4*$:@i'gCo'?(j]IDD1s0NhJ#+H>L[x5IG
++lx.g44FKp[\E{{
4Y~r\=5ntm)U&LO,~?rmua*)[FDyU{|ba ,n-Osl?*O%AAwoi6y(^f6.qtRz m%UieD,s ,`#2%"%z*)T C]}9xiool+5hlG 7x9xq.N?K#!v70o%W"aa#gqm?btkABf1y6kudW\L-NzUvZK4oN^G)D|;&dU_9*k5NR]Nlmu.J NT6lW-a% ItC&1`{z'`kP wh"0h{
Copyright 2023, VDOT. The trench s dimensions and location are typically 1 foot wide and 2 to 4 inches below the subgrade and adjacent to the pavement edge. (don t test 1st compacted lift) = 104 in. Concrete Field - Current ACI must be submitted to MaterialsCertification@vdot.virginia.gov ; Soils and Aggregate Compaction - Physical demonstration of proficiency - scheduled by CCWA **New **Central Mix Aggregate Plant - Physical demonstration of proficiency - scheduled by CCWA **New** To learn about CHANGES up to 2018, please review the . SECTION 9. hbbd``b`$CC`q@ &H" Inspection is performed in accordance with VTM v1.0 Chapter 4 18, 19 1) What should be located before starting to dig? This site uses cookies to enhance site navigation and personalize your experience. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. VDOT Soils and Aggregate Compaction 2016v1.0 Appendix E | 9 Product data for drainage piping specialties. x; =@~fKJU
>e A .E,fjd=|
^'(rN_92>#e' ?Ab t40 [$b3F l`fz>q!`\U1Dsb@2l P9 % 10) What is the maximum backfill lift thickness? SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials, To make this website work, we log user data and share it with processors. Pipe should be stored in an out of the way location where it will not be damaged. Section Procedures) When lift holes are provided in concrete pipe or precast box culverts, the Contractor shall install a lift hole plug furnished by the manufacturer.
`*r[anyv Where applicable, pulleys may be incorporated into the system to change the direction of pull so that inspection personnel need not physically enter the pipe, culvert or manhole. %PDF-1.4 Concrete Field 1. The current deadline to have Soils and Aggregate Proficiency exams completed by is . The following drawing provides typical VDOT standards for pipe bedding and backfill. Dense graded aggregates are used in pavement to give the structure more strength. True. 1. Soiltight joints provide protection against infiltration of backfill material containing high percentage of coarse grain soils, and are influenced by the size of the opening (maximum dimension normal to the direction that the soil may infiltrate) and the length of the channel (length of the path along which the soil may infiltrate). Install Pipe The grade of the pipe should always be monitored during installation. 1 (do not test 1st lift) = 4) = 11 tests required per 300 5) Length of run = 856 ft.; therefore 3 sets of tests required 6) 11 x 3 = 33 tests required for total run (minimum) (Answer) 2016v1.0 Chapter 4 13, 14 Backfill around Drop Inlets (minimum) One test every other lift around the perimeter; beginning after the first 4 inch compacted lift above the bedding and continue to the top of the structure. Silt and clay are made up of particles smaller than the No. When moving concrete pipe you should pick it up by one end. Currently VDOT certified or Mid Atlantic Regional Technician Program (MARTCP) in the following disciplines: - Expected VDOT Certifications Soil and Aggregate Field Compaction Asphalt Field Hydraulic Cement Concrete Field Pavement Marking Flagger Certification Certification & Issuing Agency Soil and Aggregate Compaction - VDOT or NICET LEVEL II* Each layer of Class I and regular backfill material shall be compacted by rolling, tamping with mechanical rammers, or hand tamping with heavy metal tampers with a face of at least 25 square inches. 71 terms. VDOT Soils and Aggregate Compaction 2016v1.0 Appendix B | 2 Students must bring valid ID & attend class in order to test. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. + (12 in. For flexible pipe this begins 12 over top of pipe for smaller pipe and 18 for pipe 54 and larger. When backfill is below spring line of pipe, compact next to pipe first and work towards the trench wall. 0
All cracks shall be digitally scanned to allow for accurate measurement. The moisture content at which a soil begins to behave like a liquid is called the liquid limit. 11 terms. In addition, two app roaches, soil compaction, and optimal workability are Download Free PDF. VDOT Soils and Aggregate Compaction: Chapter 2, VDOT Soils and Aggregate Compaction: Chapter 3, VDOT Soils and Aggregate Compaction: Chapter 4, VDOT Soils and Aggregate Compaction: Chapter 5, VDOT Soils and Aggregate Compaction: Chapter 8, VDOT Soils and Aggregate Compaction: Chapter 6. SOILS AND AGGREGATE FIELD CERTIFICATION STUDY GUIDE 2015 Prepared by: The Virginia Department of Transportation, Materials Division Note: The information included in this manual is generally compatible with current VDOT Speci cations and instructions; however, it should not be considered a source book for speci cations. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for, CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL, Session 7: Retrofitted Edge Drains 7.1 Learning Outcomes 1. For questions or concerns regarding MCS grades or certification status, contactus at MaterialsCertification@vdot.virginia.gov. LD Instructional and Informational Memoranda. Describe recommended installation procedures 4. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and, SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. 794 (d), please call 800-367-7623. 19 terms. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. MANHOLES 7-4 7.5. To prevent sloping soils from becoming. After pipe installation and prior to backfilling, plugs shall be installed from the exterior of the pipe or box culvert and snugly seated. 2016v1.0 Chapter 4 17, 18 8) At the end of the run ( feet) a 45 degree elbow is used to connect the longitudinal pipe to the non perforated outlet pipe to force the collected water to discharge. Deficiencies found may include: but are not limited to, the following: Crushed, collapsed or deformed pipe or joints Alignment defects Improper Joints (allow infiltration of soil) Misaligned joints (allow debris accumulation) Pipe Penetrations (guardrails, utilities, etc.) What is compaction? JnqYj A"@. Furnish and install culvert pipe, entrance pipe, and storm sewer pipe. 4 in. Table of Contents I. Iowa DOT Information a. AASHTO T99 The Moisture-Density Relations of Soils using a 5.5-pound Rammer and a 12-inch drop. All new construction involves a study and analysis of the on-site soils. CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements, DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and, 715.01 430 volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. 5) True or False. stiffness 35 psi) is the collecting conduit 4) Aggregate backfill (#8 or #57) 5) Non perforated smooth wall outlet pipe (min. Block and gravel inlet Protection (Temporary) 6.52.1. 1.02 REFERENCES, PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions. The requirements for pipe material and installation in sewer and drainage collection systems. The CCWA is hosting the following courses, which are available in a traditional (instructor-led) format or as a self-study option, allowing the students to challenge the Materials Certification exams: For more information on CCWA courses and registration click hereor contact CCWA at 804-523-2290 or 804-523-2292. Haunching material may be Class 1 and must be placed and compacted in 6 inch loose/4 inch compacted maximum lifts, compacted to 95 percent standard proctor density. Suggested participants would include contractor and supplier quality control personnel, consultants, testing firms and agency . 5.01 Design, PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS, SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO), TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe.